sewer

The Big Sky County Water and Sewer board discuss findings from the AE2S study that resulted in a rate hearing. PHOTO BY JANA BOUNDS

Addressing rate discrepancies

Ryan Graf with AE2S engineering firm teleconferenced with the Big Sky County Water and Sewer (BSCWS) board at the Oct. 22 rate hearing. 

He explained that the study was established to understand and fine-tune a plan to address cost of service incongruities between water and sewer users in the district. 

Revamping rates

Big Sky County Water and Sewer District (BSCWSD) board found themselves in a continuous onslaught of numbers at the July 16 board meeting. Number crunching was the name of the game as they were walked through the current water and sewer rates and a recent rate design study conducted by engineering firm AE2S.

More Information

Lone Peak Lookout

235 Snowy Mtn Circle
Big Sky, MT 59716
www.lonepeaklookout.com

Editorial: editor@lonepeaklookout.com
Ad orders, inserts: Cori Koenig, sales@lonepeaklookout.com 406.579.6877
Billing: shill@lonepeaklookout.com

Comment Here